Application of MBR film
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2020-10-20
- Views:0
(Summary description)Many factors are related to the stability of MBR membrane. In order to better MBR membrane, we need to understand these factors. What are the factors? Check it out below together.
Application of MBR film
(Summary description)Many factors are related to the stability of MBR membrane. In order to better MBR membrane, we need to understand these factors. What are the factors? Check it out below together.
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2020-10-20
- Views:0
Many factors are related to the stability of MBR membrane. In order to better MBR membrane, we need to understand these factors. What are the factors? Check it out below together.
1. Start the combined membrane bioreactor. Perform inoculation sludge treatment concentration, after the membrane bioreactor system operation management is basically stable, start the membrane separation operation.
2. The membrane is contaminated and the maintenance is not very good. The MBR membrane can be placed in a method of drug preparation and soaking for a certain period of time to restore the membrane's filtration performance.
3. Maintain MBR hydraulic resource cycle conditions. To maintain the good hydraulic erosion effect of the MBR membrane, the design of the upper and lower flow channels of the reactor should be reasonable, and the amount of aeration should be appropriate.
Scan the QR code to read on your phone
MBR film treatment process
Application of MBR film
Rural sewage treatment equipment needs to be carefully cleaned inside and outside
Yantai Jinhong Membrane Technology Co., Ltd.
Service Hotline:
company address:
96 Chushan East Road, Economic Development Zone, Zhaoyuan City, Shandong Province
Yantai Jinhong Membrane Technology Co., Ltd.
Yantai Jinhong Membrane Technology Co., Ltd. Lu ICP No.14008806 Powered by 300.cn